Your data doesn't train Genie's AI
You keep IP ownership聽of your docs
1. Document Control Information: Project details, document version, revision history, and approval status
2. Project Information: Site address, project description, client details, and key contact information
3. Scope of Works: Detailed description of scaffolding works to be undertaken
4. Resources Required: Personnel, equipment, tools, and materials needed for the scaffolding work
5. Competency Requirements: Required qualifications, training, and experience for personnel involved
6. Site Setup and Preparations: Site layout, access routes, material storage, and preliminary safety measures
7. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling
8. Risk Assessment: Identification of hazards, risk evaluation, and control measures
9. Emergency Procedures: Emergency response plans, first aid arrangements, and evacuation procedures
10. Environmental Considerations: Environmental impact assessment and control measures
11. Communication Plan: Methods of communication between team members and other stakeholders
12. Monitoring and Supervision: Supervision arrangements and inspection procedures
1. Specialized Access Requirements: For projects requiring unusual access methods or special equipment
2. Confined Space Procedures: When scaffolding work involves confined space entry
3. Interface with Other Activities: When scaffolding work needs to coordinate with other concurrent site activities
4. Weather Contingency Plans: For projects particularly susceptible to weather conditions
5. Traffic Management Plan: When scaffolding affects public roads or heavy site traffic
6. Noise Management: When work is in noise-sensitive areas or involves noisy operations
1. Schedule A - Risk Assessment Matrix: Detailed risk assessment tables and scoring methodology
2. Schedule B - Site Layout Plans: Drawings showing scaffold locations, access routes, and storage areas
3. Schedule C - Scaffold Design Drawings: Technical drawings and specifications for scaffold structures
4. Schedule D - Equipment Certificates: Certificates for scaffold equipment and inspection records
5. Schedule E - Training Records: Copies of relevant training certificates for key personnel
6. Schedule F - Emergency Contact List: Complete list of emergency contacts and procedures
7. Schedule G - Inspection Forms: Templates for daily, weekly, and special scaffold inspections
8. Schedule H - Toolbox Talk Topics: Safety briefing contents and attendance records
Find the exact document you need
Slab Coring Method Statement
A Canadian-compliant technical document outlining safe methodology and requirements for concrete slab coring operations, including safety procedures and regulatory compliance measures.
Scaffold Risk Assessment And Method Statement
A Canadian-compliant safety and methodology document for scaffolding operations, combining risk assessment and detailed work procedures under federal and provincial regulations.
Method Statement For Demolition Of Concrete Slab
A Canadian-compliant technical document outlining safe procedures and methodologies for concrete slab demolition operations.
Painting Risk Assessment And Method Statement
A Canadian-compliant safety and methodology document for painting operations, combining risk assessment and detailed work procedures in accordance with federal and provincial regulations.
骋别苍颈别鈥檚 Security Promise
Genie is the safest place to draft. Here鈥檚 how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; 骋别苍颈别鈥檚 AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
