tiktok成人版

Scaffold Risk Assessment And Method Statement Template for New Zealand

A Scaffold Risk Assessment and Method Statement (RAMS) is a comprehensive safety and methodology document required under New Zealand health and safety legislation for scaffolding works. It combines detailed risk assessment procedures with step-by-step methodology for scaffold installation, use, and dismantling. The document ensures compliance with the Health and Safety at Work Act 2015 and associated regulations, incorporating WorkSafe NZ guidelines and relevant Australian/New Zealand standards for scaffolding operations. It serves as both a safety management tool and a practical guide for all parties involved in scaffolding works.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With tiktok成人版:

拢0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership聽of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Scaffold Risk Assessment And Method Statement?

The Scaffold Risk Assessment And Method Statement is a crucial document required for any scaffolding work in New Zealand, designed to ensure compliance with the Health and Safety at Work Act 2015 and associated regulations. This document is essential when planning, executing, and managing scaffolding operations, whether for construction, maintenance, or renovation projects. It provides a comprehensive framework for identifying potential hazards, implementing control measures, and establishing safe work procedures. The RAMS must be prepared before commencing any scaffolding work and should be regularly reviewed and updated throughout the project lifecycle. It serves as a key reference document for all stakeholders involved in scaffolding operations and demonstrates compliance with New Zealand's strict workplace safety requirements.

What sections should be included in a Scaffold Risk Assessment And Method Statement?

1. Project Information: Details of the project including site address, client details, scope of scaffolding work, and project duration

2. Responsible Persons: List of key personnel including project manager, site supervisor, scaffolding supervisor, and safety officer with their contact details and responsibilities

3. Site Description: Detailed description of the work site, access points, ground conditions, and surrounding environment

4. Risk Assessment: Comprehensive assessment of all potential hazards, risk levels, and existing control measures

5. Control Measures: Detailed description of safety measures implemented to mitigate identified risks

6. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling

7. Emergency Procedures: Emergency response plans, evacuation procedures, and emergency contact information

8. Equipment Requirements: List of required scaffolding equipment, tools, and PPE with specifications

9. Training Requirements: Required qualifications, certifications, and training for workers involved

10. Monitoring and Review: Procedures for regular inspections, maintenance, and documentation requirements

What sections are optional to include in a Scaffold Risk Assessment And Method Statement?

1. Environmental Management: Environmental protection measures when working in sensitive areas or adverse weather conditions

2. Traffic Management: Required for sites where scaffolding work affects public roads or pedestrian access

3. Noise Management: When scaffolding work is conducted in noise-sensitive areas or during restricted hours

4. Public Protection: Additional measures required when working in public areas or near occupied buildings

5. Special Access Requirements: For projects requiring unusual access methods or equipment

6. Temporary Works: When additional temporary structures or supports are required

What schedules should be included in a Scaffold Risk Assessment And Method Statement?

1. Schedule A - Site Layout Plan: Detailed site plans showing scaffold locations, access points, and safety zones

2. Schedule B - Risk Assessment Matrix: Detailed risk assessment scores and methodology

3. Schedule C - Equipment Specifications: Technical specifications for all scaffolding components and equipment

4. Schedule D - Inspection Checklist: Daily and weekly scaffold inspection forms

5. Schedule E - Training Records: Copies of relevant training certificates and competency records

6. Schedule F - Emergency Contact List: Comprehensive list of emergency contacts and procedures

7. Appendix 1 - Technical Drawings: Detailed scaffold design drawings and calculations

8. Appendix 2 - Manufacturers' Guidelines: Relevant equipment manufacturer specifications and guidelines

9. Appendix 3 - Permits: Copies of relevant work permits and authorizations

10. Appendix 4 - Safety Data Sheets: SDS for any hazardous materials used in the scaffolding process

Authors

Alex Denne

Head of Growth (Open Source Law) @ tiktok成人版 | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

New Zealand

Document Type

Method Statement

Cost

Free to use

Find the exact document you need

Scaffold Risk Assessment And Method Statement

A New Zealand-compliant safety and methodology document for scaffolding works, combining risk assessment and detailed work procedures under NZ health and safety legislation.

Download

Cleaning Risk Assessment And Method Statement

A New Zealand-compliant document that combines risk assessment and detailed methodology for safe cleaning operations, adhering to local health and safety regulations.

Download

Method Statement For Demolition Of Concrete Slab

A technical document outlining procedures and safety requirements for concrete slab demolition under New Zealand health and safety regulations.

Download
See more related templates

骋别苍颈别鈥檚 Security Promise

Genie is the safest place to draft. Here鈥檚 how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; 骋别苍颈别鈥檚 AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it