Your data doesn't train Genie's AI
You keep IP ownership聽of your docs
1. 1. Introduction: Project details, scope of works, and document purpose
2. 2. Reference Documents: List of relevant codes, standards, and specifications being followed
3. 3. Responsibilities: Key personnel and their roles in formwork operations
4. 4. Materials and Equipment: Specifications of aluminum formwork components and required equipment
5. 5. Pre-Installation Requirements: Site preparation, material inspection, and preliminary checks
6. 6. Installation Procedure: Step-by-step process for formwork assembly and installation
7. 7. Safety Requirements: Mandatory safety measures, PPE requirements, and risk controls
8. 8. Quality Control: Inspection points, tolerances, and quality assurance measures
9. 9. Concrete Pouring Procedure: Methods for concrete placement and formwork monitoring
10. 10. Striking Procedure: Process for safe removal and dismantling of formwork
11. 11. Storage and Maintenance: Requirements for cleaning, storing, and maintaining formwork components
1. Special Weather Provisions: Additional measures for extreme weather conditions, used in projects exposed to severe weather
2. High-Rise Considerations: Special procedures for high-rise buildings, included when working above certain heights
3. Automated Systems Integration: Procedures for projects using automated formwork systems or sensors
4. Specialized Architectural Features: Additional procedures for complex architectural elements or designs
5. Emergency Response: Specific emergency procedures beyond standard safety measures, used in high-risk environments
6. Environmental Protection Measures: Additional environmental controls, included when working in environmentally sensitive areas
1. Appendix A - Technical Drawings: Detailed drawings of formwork components and assembly details
2. Appendix B - Inspection Checklists: Pre-pour, during-pour, and post-pour inspection forms
3. Appendix C - Risk Assessment: Detailed risk assessment for formwork operations
4. Appendix D - Load Calculations: Engineering calculations for formwork loads and support systems
5. Appendix E - Equipment Specifications: Detailed specifications of all major equipment to be used
6. Appendix F - Safety Data Sheets: SDS for any chemicals or release agents used
7. Appendix G - Quality Control Forms: Forms for recording quality checks and non-conformances
8. Appendix H - Training Records Template: Templates for recording worker training and competency
Find the exact document you need
Breaking Lease Letter
A formal notice under Hong Kong law for early lease termination, documenting a tenant's intention to end a lease agreement before its scheduled completion date.
Water Supply Complaint Letter
A formal complaint letter template for addressing water supply issues with Hong Kong's Water Supplies Department, following local regulatory requirements.
Site Access Agreement
A Hong Kong law-governed agreement establishing terms and conditions for authorized access to premises or facilities, including safety, security, and liability provisions.
Road Agreement
A Hong Kong law-governed agreement for road construction, maintenance, or improvement works, detailing technical specifications and regulatory requirements.
Water Leakage Complaint Letter To Society
A formal complaint letter to property management societies regarding water leakage issues in Hong Kong properties, aligned with local building management regulations.
Method Statement For Column Formwork
A technical document detailing procedures and safety requirements for column formwork operations under Hong Kong construction regulations.
Method Statement For Demolition Of Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab demolition in Hong Kong, complying with local building regulations and safety standards.
Timesheet Invoice
A Hong Kong-compliant billing document that combines detailed time tracking with standard invoice elements for charging based on time spent on projects or services.
Painting Invoice
A Hong Kong-compliant invoice template for painting services, including detailed service breakdowns and payment terms.
Landscaping Invoice
A Hong Kong-compliant invoice document for landscaping services, including service details, costs, and payment terms.
Tooling Agreement
A Hong Kong law-governed agreement setting out terms for industrial tooling supply, ownership, and usage rights.
Aluminium Formwork Method Statement
A technical document outlining procedures and safety requirements for aluminum formwork operations in Hong Kong construction projects, compliant with local building and safety regulations.
Survivorship Deed
A Hong Kong legal document that transfers property ownership to surviving joint tenant(s) following the death of a co-owner.
Method Statement And Risk Assessment For Excavation
A technical document outlining excavation methodology and safety procedures under Hong Kong construction regulations, detailing risk assessment and control measures for safe excavation works.
Conciliation Settlement Agreement
A legally binding agreement under Hong Kong law that documents the terms of settlement reached through conciliation, including resolution terms and mutual obligations of the parties.
Savings Account Agreement
A Hong Kong law-governed agreement establishing terms and conditions for savings account services between a bank and its customers.
Group Release Form
A Hong Kong law-governed form obtaining collective consent and liability waivers from multiple participants for organizational activities and events.
Rollover Loan Agreement
A Hong Kong law-governed agreement establishing a rollover loan facility with provisions for successive loan period extensions and associated terms.
Middleman Commission Agreement
A Hong Kong law-governed agreement establishing terms and commission structure between a principal and middleman for business facilitation services.
骋别苍颈别鈥檚 Security Promise
Genie is the safest place to draft. Here鈥檚 how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; 骋别苍颈别鈥檚 AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
